Bulk carrier discharging imported thermal coal at a Pakistani port

South Africa and Indonesia to Pakistan

Imported Coal Supply to the Pakistani Cement Sector

A cement kiln that runs out of fuel is a shut plant. Over years of supply, our customers were never short.

Location
South Africa and Indonesia to Pakistan
Material
Imported thermal coal
Scope
International sourcingQuality specificationShippingPort handlingInland delivery

The situation

What we walked into

Pakistani cement plants run on imported coal and they cannot stop. A kiln that runs out of fuel is not a delayed delivery, it is a shut plant.

The requirement is specific calorific value, controlled sulphur and ash, delivered continuously and priced against a volatile market.

Coal stockpile at the port terminal ahead of inland delivery
Photography outstanding

Cement plant receiving scheduled coal delivery

What we did

End to end

Sourcing

We sourced from both South Africa and Indonesia, which are different coals with different specifications and different freight economics.

Running both meant supply was not exposed to a single origin, a single port or a single market condition.

Specification and quality

We matched coal specification to each plant's kiln requirements and verified quality at load port, because a specification failure discovered at the plant is a specification failure discovered far too late.

Logistics

Ocean freight, port discharge, storage and inland delivery to plant, scheduled against each plant's consumption rate rather than against convenience.

The result

What changed

Continuous coal supply to cement producers across Pakistan over multiple years. Dual origin sourcing gave supply security when a single origin would have left customers exposed.

This is the work that built Halberg's international trading and shipping capability, and it is why the company understands the buyer's end of the chain as well as the producer's end.

2 origins
South Africa and Indonesia, so supply was never exposed
Multi year
Continuous supply to cement plants across Pakistan
At load port
Where quality was verified, not at the plant gate
Never short
Across years of supply
Close detail of thermal coal showing black glossy fracture faces
Photography outstanding

Coal trucks on the inland delivery run to a cement plant

Feedback

A cement plant cannot wait. In years of supply we were never short.
Procurement lead, cement sector